The job
The existing timber decking needed to be removed so the supporting trailer structure could be exposed and new timber positioned correctly.

Float trailer repair
HT91 float timber decking replacement completed, from removal of the old decking through to the finished timber deck.
The existing timber decking needed to be removed so the supporting trailer structure could be exposed and new timber positioned correctly.
The HT91 float timber decking replacement is complete, with replacement timber fitted across the trailer deck.
Repair sequence









Dom’s original work photos, taken at different repair stages and viewpoints. Open the photos above to inspect each original.