Mildura · Red Cliffs · Sunraysia
24/7 breakdown enquiries Leave a reviewCustomer Portal
Skip to content
DDOMINATEHEAVY MECHANICAL
Dominate / Quick access

Find your next step.

Popular destinations

Dominate / On your device

One tap away.

Keep calls, quote requests and our latest field work close at hand.

  1. 01

    Open this website in Chrome on your phone.

  2. 02

    Open the browser menu and choose Install app or Add to Home screen.

  3. 03

    Follow the browser prompts to add Dominate to your home screen.

Sign in when opening your customer or admin records.

0482 650 448
HT91 float trailer with replacement timber decking completed across the deck
All case studies

Float trailer repair

HT91 Timber Decking Replacement

HT91 float timber decking replacement completed, from removal of the old decking through to the finished timber deck.

01

The job

The existing timber decking needed to be removed so the supporting trailer structure could be exposed and new timber positioned correctly.

02

Work completed

  • Existing decking removed from the float
  • Crossmembers exposed and work area cleared
  • Replacement timber measured and positioned
  • New decking progressively secured across the trailer
03

Documented result

The HT91 float timber decking replacement is complete, with replacement timber fitted across the trailer deck.

Repair sequence

The work
in detail.